There are two important items to note before installation. The Gateway should always be connected at the discharge zone of a conveyor branch.
Secondly, the CAT 6 cable connecting the Gateway to the first zone must be 100 feet or less in length.
IMPORTANT: The Gateway can be installed within 100 feet of the discharge zone. It must be wired to the discharge zone, but can be installed anywhere within 100 feet of the discharge zone.
Once all connections are in place, turn the power back on to the conveyor. Give the system a moment to establish communication. When it’s ready, you should see the following green LEDs on the Gateway:
Serial Network Out
Control Fuse
System Fault
Control Power
Optional: Setting the IP Address (For PLC Use)
If you’re using a PLC and need to assign an IP address:
Connect to the system using EZLogic® OS and go to the Gateway tab.
Select “Ethernet/IP Settings” in the Parameter Selection Pane.
In the Configuration Editor, switch to manual mode.
Enter your IP Address, Subnet Mask, and Default Gateway values.
Click Save to apply your settings.
Uploading a Configuration from an SD Card
If you already have a configuration saved to an SD card:
Insert the SD card into the SD slot on the bottom left side of the Gateway.
With the system powered on, hold the reset button until the blue upload LED turns on, then off. (Note: The Reset button is in a small slit between the Configuration port and Serial Network Out port.)
Your EZLogic® NET Gateway is now properly installed and configured.
If you have more questions or need troubleshooting help, reach out to your Hytrol Solutions Provider or our Customer Care team.