Eder-Goodman is a leading wine and spirits wholesaler based in West Haven, Connecticut. With more than five thousand active SKUs and thousands of cases moving through its warehouse each night, the company relies on efficient distribution operations to deliver products across the state on tight schedules.
Hytrol Conveyor Company and Conveyor Handling Company (CHC) partnered to design and implement a material handling solution that would support Eder-Goodman's growing operation and long-term success. The companies have been working together to provide material handling solutions since 1996.
For Eder-Goodman, maintaining its nightly operating cycle is critical. With approximately 90 salespeople transmitting orders throughout the day, the warehouse operates on a tightly defined schedule. Orders close at 6:00 p.m., routing begins by 7:00 p.m., picking typically starts around 9:00 p.m., and trucks begin loading between 10:30 and 11:00 p.m. for delivery the following day.
“You just can't miss an operational cycle in our business,” said Cutter Smith, Co-President of Eder-Goodman.
“The biggest challenge was trying to get those three companies with that inventory and the volumes that they were looking at out the door,” said Anthony Peruta, Sales Engineer at CHC. “They were running just one truck at a time in the former system they had, but now we wanted to run multiple trucks and handle the volume in a timely manner.”
The existing operation could no longer provide the capacity Eder-Goodman needed as the company grew.
“The system worked for what we needed it for, but the merger and acquisition were happening, and we needed a system that could produce more cases per hour and be able to load more than one truck at a time,” said Adam Casella, Warehouse Manager at Eder-Goodman.
Working alongside Eder-Goodman and its consultant, Conveyor Handling Company designed a solution focused on increasing throughput while allowing warehouse operations to continue throughout installation.
That presented another challenge: Eder-Goodman still needed to fulfill orders every night while the new material handling system was being installed.
“The biggest consideration we had was to allow them to continue running on their legacy system while we were putting the new one in," explained Seth Karambelas, Project Manager at CHC. "In the beginning, we even rerouted one of their lines to make room for the new pick module so they could continue loading trucks while we were putting the new system in.”
Orders are released in waves to both the AutoStore and conveyor picking operations. Products from the two areas then merge into a unified material flow before traveling through transportation and accumulation conveyor to a mezzanine-level sortation area. From there, the ProSort 1431 directs products to the appropriate truck-loading locations.
“We’re a wave-based picking system,” Casella said. “When the waves are in order at the pre-merge, they're sorted properly to release from all three lines. From those three lines, they're sent to the sorter, where they'll get sent down to the truck, and that whole process, they always stay in the correct order that they were put in on the conveyor system itself.”
The system was designed around a 30 case per minute throughput goal, which Peruta said it is successfully meeting.
Since implementation, the system has enabled Eder-Goodman to double throughput while maintaining the overnight operating cycle required to support next-day delivery.
“Prior to this system, a 7,000-case night was huge for us. To get that done was a small feat in a single night. Now we do those numbers on our slowest nights, and we can go all the way up to 14,000 cases right now and feel comfortable about getting it done in a reasonable amount of time.”
— Adam Casella, Warehouse Manager at Eder-Goodman
Beyond meeting Eder-Goodman’s current volume requirements, the system provides additional capacity to support future growth.
“We have given Eder-Goodman a system that allows them to meet their productivity goals with room to expand in the future if they acquire other companies or get more orders,” Karambelas said. “We've helped increase their workflow and are continuing to try and help with that as well.”
“CHC has been great for us,” Casella said. “We still talk to them monthly, if not weekly, on updates and things we may want changed or things that are going well that we've changed in the past. So, it's been a great experience.”
For Smith, that ongoing relationship is an important part of what made the project successful. “The people that are doing the work for you are almost just as important as the quality of the product you bring. If you can put them both together, it's a total home run and, and for us, it's been that.”
Interested in being part of a future Hytrol case study? If you have a recent Hytrol project or customer success story you’d like to share, we'd love to hear about it.