Ask Hytrol

Ask Hytrol: How to Properly Install the E24™ 3.0 Card

Ask Hytrol

In this Ask Hytrol video, we’re going to talk about how to install Hytrol’s E24™ 3.0 card. The E24™ 3.0 card offers increased versatility and reliability over the previous generation. To install this technology, follow proper lock-out tag-out procedures and then…

Ask Hytrol: How to Replace a Drop-In Pulley

Ask Hytrol

Today, we’re going to demonstrate how simple it is to replace a drop-in pulley. With its quick-change capabilities, this pulley’s drop-in design allows for minimal downtime on the production floor. This style of pulley can be found on the induction…

Ask Hytrol: Importing a Parts Order from an .h4i File

Ask Hytrol

Importing a spare parts order into HEROES allows for electronic tracking for spare parts orders and removes the possibility of order duplication. Let’s talk about how to import this list from HyNet. After you’ve logged into HyNet, click “Spare Parts”…

Ask Hytrol: EZLogic® Zone Status Lights

Ask Hytrol

Welcome to Ask Hytrol. Today, we’re going to talk about reading EZLogic® LED indicator lights to determine zone status. The first step when troubleshooting an error on any Hytrol EZLogic® model of conveyor is to determine whether or not…